The site and facility remodeling plan is the deliverable that is produced after the________ phase.


A) Documentation
B) Training
C) Installation
D) Support

Correct Answer

verifed

verified

The purpose of regression testing is for users to determine whether the system meets their requirements.

Correct Answer

verifed

verified

Inspections are formal group activities where participants manually examine code for occurrences of well-known errors.

Correct Answer

verifed

verified

In a Master Test Plan,test materials fall under which category?


A) Overall Plan
B) Testing Requirements
C) Procedure Control
D) Component-Specific Test Plans

Correct Answer

verifed

verified

A help desk is a single point of contact for all user inquiries and problems about a particular information system or for all users in a particular department.

Correct Answer

verifed

verified

Computer-based training aids are related to which category of deliverable for Documenting the System,Training,and Supporting Users?


A) User Training Plan
B) User Training Modules
C) Documentation
D) User Support Plan

Correct Answer

verifed

verified

Bulletin boards and other support mechanisms are related to which category of deliverable for Documenting the System,Training,and Supporting Users?


A) Documentation
B) User Training Modules
C) User Training Plan
D) User Support Plan

Correct Answer

verifed

verified

"Add to cart,list section,calculate tax,change personal data" are examples of scenarios that fall into which testing category?


A) Simple functionality
B) Multiple functionality
C) Function chains
D) Elective functions

Correct Answer

verifed

verified

Different forms of refactoring include simplifying complex statements,abstracting solutions from reusable code,and removing duplicate code.

Correct Answer

verifed

verified

Which installation runs the old information system and the new one at the same time until management decides the old system can be turned off?


A) Direct installation
B) Phased installation
C) Parallel installation
D) Single-location installation

Correct Answer

verifed

verified

In a Master Test Plan,document control falls under which category?


A) Overall Plan
B) Testing Requirements
C) Procedure Control
D) Component-Specific Test Plans

Correct Answer

verifed

verified

The intent of the alpha test is to determine whether the software,documentation,technical support,and training activities work as intended.In essence,alpha testing can be viewed as a rehearsal of the installation phase.

Correct Answer

verifed

verified

Training materials are related to which category of deliverable for Documenting the System,Training,and Supporting Users?


A) User Training Plan
B) User Training Modules
C) Documentation
D) User Support Plan

Correct Answer

verifed

verified

________ testing is defined as the process of bringing together all of the programs that a system comprises for testing purposes.


A) Unit
B) Integration
C) Stub
D) System

Correct Answer

verifed

verified

Which installation changes from the old information system to the new one incrementally,starting with one or a few functional components and then gradually extends the installation to cover the whole new system?


A) Direct installation
B) Phased installation
C) Parallel installation
D) Single-location installation

Correct Answer

verifed

verified

To verify that a system meets its objectives,________ testing involves using non-live test data in a non-live testing environment.


A) Unit
B) System
C) Integration
D) Stub

Correct Answer

verifed

verified

________ is the process whereby the physical design specifications created by the analysis team are turned into working computer code by the programming team.


A) Testing
B) Coding
C) Training
D) Installation

Correct Answer

verifed

verified

"Returned items,lost shipments,item out of stock" fall into the function chains testing category.

Correct Answer

verifed

verified

________ has detailed information about a system's design specifications,its internal workings,and its functionality.


A) An installation document
B) A design document
C) User documentation
D) System documentation

Correct Answer

verifed

verified

Program documentation is the deliverable that is produced after the ________ phase.


A) Testing
B) Coding
C) Installation
D) Support

Correct Answer

verifed

verified

Showing 41 - 60 of 95