The reward and benefits systems in place in companies need not be reviewed with the implementation of a lean system.

Correct Answer

verifed

verified

A JIT II system brings the supplier into the customer's plant.

Correct Answer

verifed

verified

Table 7.1 A toy company uses a kanban system to make a metal fastener that is a component of several toys. The waiting time for a container of the fasteners during production is 0.25 day; average processing time is 0.15 day per container. Each container holds 200 fasteners. The company uses 2000 fasteners a day in the production of its product. -Use the information in Table 7.1.How many kanban containers would be required if a 10 % efficiency factor is used?


A) 3 or less
B) 4 or 5
C) 5 or 6
D) 7 or more

Correct Answer

verifed

verified

In lean systems,small lot sizes are required,resulting in a large number of setups,which means companies must significantly reduce ________.

Correct Answer

verifed

verified

The Japanese word for card that has come to mean "signal" is ________.

Correct Answer

verifed

verified

For firms along the supply chain,two aspects of lean systems that are important to manage include close supplier ties and small batches.

Correct Answer

verifed

verified

A(n)________ assembly line produces a mix of models in smaller lots.

Correct Answer

verifed

verified

JIT systems maintain relatively large lot sizes as a means to reduce process variability.

Correct Answer

verifed

verified

Just-in-time (JIT)systems prefer that production is done is large lot sizes.

Correct Answer

verifed

verified

What are the general operating rules of a single card system?

Correct Answer

verifed

verified

1.Each container must have a card.
2.The...

View Answer

A company uses a kanban system.The daily demand for part A is 200 units.The average waiting time for a container of parts is 0.10 day.The processing time for a container of part A is 0.05 day,and a container holds 4 units.If the company wishes to use a 5% policy variable,how many containers are needed?

Correct Answer

verifed

verified

k = blured image blured image = = ...

View Answer

The final assembly schedule in a JIT system


A) should be developed for each product independent of the process requirements for the other products.
B) strives to create a uniform flow at the work centers in the plant.
C) avoids the use of small lot sizes because they create many production orders and cause confusion.
D) allow daily changes in demand levels, regardless of size, to be incorporated immediately into the work center schedules.

Correct Answer

verifed

verified

For firms along the supply chain,two aspects of lean systems that are important to manage include ________ and ________.

Correct Answer

verifed

verified

close supplier ties,...

View Answer

The advantages of JIT systems include all but which one of the following?


A) reduction in space requirements
B) increase in productivity
C) reduction in inventory
D) reduction in machine utilization

Correct Answer

verifed

verified

What are the organizational issues companies must address before implementing a JIT system?

Correct Answer

verifed

verified

The organizational issues faced by compa...

View Answer

Which one of the following competitive priorities is most often emphasized in JIT production?


A) high-performance design
B) volume flexibility
C) product flexibility
D) low cost

Correct Answer

verifed

verified

What is the purpose of jidoka?

Correct Answer

verifed

verified

Jidoka is a tool to help improve quality...

View Answer

One benefit of a just-in-time system is that it reduces space requirements.

Correct Answer

verifed

verified

The goal of single-digit setup means having setup times shorter than 10 seconds.

Correct Answer

verifed

verified

The "Made for You" system implemented in McDonald's restaurants since 2000 shifts the company more closely to a push method of production.

Correct Answer

verifed

verified

Showing 21 - 40 of 158

Related Exams

Show Answer