Guardrails are installed on all open sides and ends of scaffolds that are more than ____ feet in height.


A) 4
B) 6
C) 8
D) 10

Correct Answer

verifed

verified

A typical personal fall protection system consists of five related parts: the harness, lanyard, lifeline, rope grab, and ____.


A) guard
B) anchor
C) hoist
D) ligature

Correct Answer

verifed

verified

Pump jack scaffolds are used widely for ____, where staging must be kept away from the walls, and when a steady working height is desired.


A) roofing
B) siding
C) framing
D) partitioning

Correct Answer

verifed

verified

B

The capacity of the top horizontal member of a scaffold's end frame, called the ____, may never be exceeded.


A) bearer
B) gooser brace
C) cribbing
D) hoist

Correct Answer

verifed

verified

In a metal scaffold, ____ rigidly connect one scaffold member to another member.


A) baseplates
B) mud sills
C) cross braces
D) end frames

Correct Answer

verifed

verified

Scaffolds and scaffold parts should be visually inspected five times.

Correct Answer

verifed

verified

____-duty scaffolds are designed at 75 pounds per square foot.


A) Light
B) Medium
C) Heavy
D) Standard

Correct Answer

verifed

verified

For scaffolds greater than 3 feet wide, the vertical locations of horizontal members are repeated every ____ feet.


A) 13
B) 26
C) 36
D) 46

Correct Answer

verifed

verified

Scaffold ____ must be at least 18 inches wide with a guardrail system in place.


A) baseplates
B) mud sills
C) platforms
D) cribbing

Correct Answer

verifed

verified

If the frame sections are 5 * 7, a rolling tower can be only ____ feet high.


A) 5
B) 10
C) 15
D) 20

Correct Answer

verifed

verified

Means of access onto a scaffold include a hook-on or attachable ladder, a ramp, or a(n) ____ and are determined by the competent person on the job.


A) stair tower
B) stack of concrete blocks
C) adjacent scaffold
D) earthen mound

Correct Answer

verifed

verified

A

All workers on a scaffold must wear hard hats.

Correct Answer

verifed

verified

Workers must know the capacity of scaffolds they are erecting and using.

Correct Answer

verifed

verified

According to the U.S. Occupational Safety and Health Administration (OSHA) , employers are required to have a ____ to supervise and direct scaffold erection.


A) municipal inspector
B) competent person
C) project manager
D) state overseer

Correct Answer

verifed

verified

____ support material that is being laid out or cut to size.


A) Stepladders
B) Job-made ladders
C) Sawhorses
D) Pommel horses

Correct Answer

verifed

verified

In a metal scaffold, cross braces may be used as a means of access or egress.

Correct Answer

verifed

verified

You should never work above the second step from the top of a stepladder.

Correct Answer

verifed

verified

True

Ladders may be built on a jobsite when no ladders are available.

Correct Answer

verifed

verified

When fully loaded with personnel, tools, and material, the wood plank used to make a scaffold platform must never deflect more than 1/60th of its ____.


A) span
B) height
C) width
D) cribbing length

Correct Answer

verifed

verified

The rolling tower, or ____ scaffold, is widely used for small jobs, generally not more than 20 feet in height.


A) jackleg
B) provisional
C) mobile
D) temporary

Correct Answer

verifed

verified