Multiple Choice
A) Kaizen is the process of specifying design specifications for goods and services.
B) A cause-and-effect diagram is also called a fishbone diagram.
C) Scrap and rework costs are part of internal failure quality costs.
D) The Deming Cycle is named after a famous quality guru and consists of four steps - Plan, Do, Study, Act (PDSA) .
Correct Answer
verified
Multiple Choice
A) Define
B) Measure
C) Analyze
D) Control
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) Define (D)
B) Measure (M)
C) Analyze (A)
D) Improvise (I)
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) The 14 Points
B) ISO 9000:2000
C) The Gap model
D) Six Sigma
Correct Answer
verified
Multiple Choice
A) Prevention
B) Appraisal
C) Internal-failure
D) External-failure
Correct Answer
verified
Multiple Choice
A) Flow-charts
B) Pareto analysis
C) Cause-and-effect diagram
D) Scatter diagram
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) During the Industrial Revolution, workers on the shop floor began to take on increased responsibility for quality.
B) Six Sigma was developed in Japan as a cost reduction approach during the 1970s.
C) Deming's diagram of a value chain emphasized the importance of consumers and suppliers in supporting continuous quality improvement.
D) Beginning around 1950, Deming and Juran began educating top U.S.managers, which lead to the growth and development of quality management in the U.S.
Correct Answer
verified
Multiple Choice
A) Kaizen blitz
B) dpmo
C) Poka-yoke
D) External failure
Correct Answer
verified
Multiple Choice
A) Quality means conformance to requirements not elegance
B) The only performance standard is Six Sigma
C) There is no such thing as a quality problem
D) The only performance measurement is the cost of quality, which is the expense of non-conformance
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Showing 41 - 60 of 72