A) close relationships with trust
B) close relationships with skepticism
C) distant relationships with trust
D) distant relationships with skepticism
E) distant relationship with mistrust
Correct Answer
verified
Multiple Choice
A) removal of unnecessary activities
B) removal of in-plant inventory
C) removal of in-transit inventory
D) obtain improved quality and reliability
E) All of the above are goals of JIT partnerships.
Correct Answer
verified
Multiple Choice
A) Setup cost must be cut to one fourth its current value.
B) Setup cost must also be cut in half from its current value.
C) Setup cost must double from its current value.
D) cannot be determined
E) Setup cost must be cut one third its current value.
Correct Answer
verified
True/False
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) throughput
B) manufacturing cycle time
C) pull time
D) push time
E) queuing time
Correct Answer
verified
Multiple Choice
A) It exists just in case something goes wrong.
B) It is the minimum inventory necessary to keep a perfect system running.
C) It hides variability.
D) It is minimized with large lot production.
E) It increases if setup costs decrease.
Correct Answer
verified
Multiple Choice
A) that it takes to process one unit at a station.
B) between the arrival of raw materials and the shipping of finished products.
C) to produce one whole product through an empty system (i.e. ,with no waiting) .
D) required to move orders through the production process,from receipt to delivery.
E) required to place an order with a supplier.
Correct Answer
verified
Multiple Choice
A) Acme Foods decides to decrease the number of its suppliers to just a few.
B) Ajax,Inc.is proud to announce that incoming goods are delivered directly to the point of use.
C) Ardoyne Builders has a scheduled preventive maintenance program.
D) Cheramie Trucking trains workers to specialize and become very efficient in one job.
E) Cajun Contractors has reduced the amount of space for inventory.
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) It used a pull system to move inventory.
B) It produced in ever smaller lots.
C) It required deliveries directly to the point of use.
D) It picked the supplier that offered the lowest price based on quantity discounts.
E) It worked to reduce the company's in-transit inventory.
Correct Answer
verified
Multiple Choice
A) having too many customers
B) delivery to the point of use
C) having limited ability to respond to changes in product and quality
D) large lot sizes
E) customers' infrequent engineering changes
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) long lead times
B) easy,mindless jobs
C) specialty workers with no cross-training
D) low space requirements
E) no supplier partnerships
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) knowledgeable
B) strict job classifications
C) know more about their job than anyone else
D) empowered
E) cross-trained
Correct Answer
verified
Multiple Choice
A) Just-in-time (JIT)
B) Toyota Production System (TPS)
C) Lean operations
D) Material requirements planning (MRP)
E) kanban
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) $0.45
B) $4.50
C) $45
D) $450
E) $500
Correct Answer
verified
True/False
Correct Answer
verified
Showing 41 - 60 of 137
Related Exams